Four hours of notice is required for footer, concrete slab, and rough-in inspections. Twelve hours of notice is required for all other inspections. Inspections cannot be scheduled for a specific time.
How do I schedule an inspection?
- Call the Permits and Inspections office at (334) 615-4450
- Email permits@dothan.org
The following information is required to schedule an inspection:
- Type of Inspection
- Address of Job
- Permit Number
- Contractor Name